best air cooler and tower cooler pc and cooler para pc
Product Description
1. Type: pc and tower cpu cooler
2. Finish: Any surface can be customized
3. Rohs and ISO 9001 Certificates
4. OEM and ODM is welcomed
5. Application: computer mainboard, communication/server
Products Exhibition
Related products
Process capability
Extrusion |
Aluminum alloy and copper alloy extrusion production |
CNC |
Drilling; Milling; Turning; Deep Hole Drilling; Honing; Screw Machining |
Stamping |
Numerical Control Turret Punching, progressive punching. Precision punching |
Die-casting |
all kinds of aluminum alloy and zinc alloy die casting |
Soldering |
Reflow Oven, soldering for Thermal Module heatsink |
Forge |
Pin heatsink for chipset |
Surface finish |
Anodize; Sandblasting, Plated Nickel |
Assembly |
Assembly PAD or grease, hardware, packaging. |
Applications
Automobile |
Nameplates |
Games |
Robots |
Communications |
Electronic devices |
Heatsink |
housing |
Aircraft |
Enclosures |
Jigs |
Sound equipment |
Musical instruments |
Constructions |
Telecom |
Sporting equipment |
watercraft |
Machinery |
Lighting |
Tooling manufacture |
Optical devices |
Engines |
Medical devices |
Heat pipe applications |
Sensors |
Power |
Photographic devices |
Projector |
Products catagory
Liquid cooling HTSK |
Soldering HSK |
Folded fin HSK |
Skived fin HSK |
Housing |
Cover |
Bezel panel |
LED HSK |
NCT Punching parts |
Zipper Fin HSK |
Air cooling HSK |
VGA HSK |
Forge heatsink |
Hardpan HSK |
Power HSK |
Storage heat sink |
Memory HSK |
Transducer HSK |
Converter HSK |
Projector HSK |
Our factory and processing
Packing and delivery
Packaging:
standard eport package, we can also accept other requirment s from client.
Payment:
1.We can accept the Payment T/T and L/C.
2.The payment for the high value sample will be charged, and will be returned to you after confirming the mass production.
3.The payment for the low value sample is free, but the freight should be covered by you.
Shipping:
1.The sample will be shipped by epress, like FEDE, DHL, UPS and EMS.
And the freight should be paid by clients.
2. FOB Shenzhen or HongKong for mass production. The freight will deal with you for the concrete condition.
Delivery Time:
3 weeks after confirming all the informations.